Skip to content
Plan my event

Outdoor team building activities with a plan B

The best outdoor team building activities are simple games, a hunt and time in the open air, each with an indoor version agreed before the day.

Updated
Updated
Reading time
8 min read

Outdoor team building activities for a work group come in three kinds: relay-style games with a clear finish, a scavenger hunt, and time in the open air that nobody has to perform in. What makes or breaks the day is not the activity but the plan B, agreed before anyone checks the forecast.

So this post does both. It sets out the outdoor activities a work team can do, where they happen at our venue for team days inside Thorpe Park, and exactly what moves indoors if the weather turns. The short version of the plan B is that the Hall is through the doors behind you.

Outdoor team building activities that suit a work group

A team that sits down for a living wants to move, but not to be tested. These all have short rules, mixed teams and a result everyone can see.

  • A scavenger hunt — Teams with a list of finds and clues, racing a clock. It is on our add-ons list, and where it runs on the day is something we confirm for your date.
  • Minefield — One person blindfolded, one guiding them by voice only across a course of markers laid out in the open. It takes five minutes to set up and teaches more about giving clear instructions than any workshop.
  • Build the tallest tower — Each team gets the same pile of canes, string and tape and twenty minutes. Outdoors, the wind is part of the test, which is the point.
  • Relay with a twist — Each leg is a different task: carry, solve, find, describe. Nobody needs to be fast, because the slowest leg is a puzzle. The deck's length makes a natural start and finish line.
  • An afternoon in the park — The Bronze and Silver Day Delegate packages include park entry, so the outdoor activity can be the park itself: groups split by appetite, find the rides they want and meet again later. Only on days the park is open.
  • Exclusive ride time — One train on one coaster for your group, by the hour: Hyperia, The Swarm, Nemesis Inferno, Colossus or Stealth. The ride has to be running, so it is only on days the park is open, and it is one option alongside the games, never a test of nerve.

For games you bring yourselves, such as canes, cones or blindfolds, tell us what is coming when you book, so it is part of the plan for the space.

Benches along the red and grey floor of the Launch Pad beside its planted bank, coasters on the skyline
The Launch Pad

Where outdoor activities happen here

The Hall opens onto an outdoor deck that runs along the garden side of the building: 31 m long and 4.6 m deep, with doors straight from the main floor and steps down to a private garden. The garden looks out over Swarm Island and The Swarm.

  • The deck — A long, narrow strip, which makes it good for a start line, a relay or a team photograph, and less suited to a whole company standing in one circle.
  • The private garden — Down the steps from the deck. Its size is on request, and your quote confirms how much of it your activities use.
  • The park — Everything beyond the venue is Thorpe Park itself, which is outdoors by nature. Park entry comes with the day packages, and Fastrack can go on top for groups who want to ride more and queue less.

The rule that saves outdoor days: decide the wet version of every activity before the day, and decide who makes the call and when. A planning assumption: make the decision the afternoon before, then no second-guessing on the morning.

The plan B is the room behind you

If the rain arrives, nobody walks anywhere. The Lakeside Hall is one open room, 30 m by 25 m, directly through the doors from the deck, and it holds 800 standing, so the whole group can come in at once and carry on.

What each outdoor activity becomes indoors
OutdoorsIndoorsWhat it uses
Minefield in the gardenMinefield on the Hall floor, with chairs as the minesFloor space
Tower build in the windTower build at the tables, with a judging round on stageTables and the stage
Relay on the deckA table-to-table relay of puzzles and tasksFloor space
The scavenger huntAsk on the quote how the hunt runs on a wet dayYour quote
An afternoon in the parkChocolate rollercoaster making, or a quiz on the screenThe add-ons list and the screen

The Hall has no windows, which sounds like a drawback on a summer day and is useful on a wet one: the screen reads clearly, and the room feels the same at two in the afternoon whatever the sky is doing. The removable stage, 24 ft by 12 ft, sits on the same wall as the screen, with a projector, mic and sound on the day packages. More on the room is on the Lakeside Hall page.

How many people can take part outside

Outdoor games scale by splitting, not by squeezing. These are planning assumptions for organising the people; the space itself is set out on your quote.

  • Up to about 40 — Everyone can play the same game at the same time, in four or five teams, with one person running the clock.
  • 40 to 120 — Run two or three games at once and rotate the teams every twenty minutes. Give each station its own host from your own staff. Keep teams the same all afternoon, so each one has time to settle into how it works.
  • Over 120 — Split the afternoon between the park, the hunt and the games, and bring everyone back to the Hall for the results. The day packages carry the AV for that final gathering.
A summer company party on the Launch Pad: street-food trucks, guests at the benches and parasols open in the sun
The Launch Pad

Is a theme park a good place for a team day?

For mixing people, yes, and for a reason that has nothing to do with thrills. Queues, walks between rides and the stories afterwards put colleagues from different teams side by side for long stretches without anyone having to present anything. People choose their own level, from the biggest coaster to a coffee on a bench, and nobody comes last. It also gives a team something it rarely has at work: a shared, slightly ridiculous experience that becomes a reference point for months, the ride somebody refused or the hunt clue nobody solved.

Two honest limits. Rides have height and health restrictions, so plan something for people who will not ride. And everything in the park needs the park open: park entry, Fastrack and ride time are only on days it is open, and we confirm that for your date before it goes on the quote. Our team days are built around both of those facts.

Planning an outdoor team day, step by step

  • Check the date against the park first — If the park is part of the plan, the date has to be a day it is open. Choose the activities after that.
  • Pick the package — Bronze and Silver Day Delegate give eight hours, park entry, car parking, tea and coffee, a working lunch, Wi-Fi and AV. Silver adds breakfast and has a 100-guest minimum. Both are compared on our packages page.
  • Write the wet plan down — One line per activity, saying what it becomes indoors and who decides.
  • Tell people what to wear — Flat shoes and a layer. It sounds obvious and it is an easy reason for someone to sit out.
  • Keep the outdoor part to one afternoon — A planning assumption: two to three hours outside is enough for an office team. Bring everyone back in for the results while they still have energy, and the day ends on a high.
  • Tell us about access needs — Steps lead down from the deck to the garden, so mention anyone who cannot manage steps when you enquire, and the plan is built around them.

An itemised written quote comes back within one working day. Packages are priced per person, each activity is its own line, and the quote sets out the deposit and when the balance is due.

Questions people ask

What are good outdoor team building activities?

The good ones have short rules, mixed teams and a visible result. A scavenger hunt, Minefield, a tower build and a relay of different tasks all work for office groups. At a theme park venue, an afternoon in the park on a day it is open is an outdoor activity in itself.

What outdoor team games work for adults?

Games that test communication work better for adults than games that test speed. Minefield, where one person guides a blindfolded colleague by voice, and a timed tower build with canes and string both get people talking. A relay where each leg is a different task lets everyone contribute whatever their fitness.

What do you do if it rains on an outdoor team day?

You move indoors to a plan agreed in advance. Here, the Hall is directly through the doors from the outdoor deck, and every outdoor game has an indoor version on the Hall floor or at the tables. Decide who makes the call and when, ideally the afternoon before.

How many people can take part outdoors?

Any number, as long as you split them. Up to about 40 people can play one game together; beyond that, run several games at once and rotate teams. For a big group, divide the afternoon between the park, the hunt and the games, then bring everyone back to the Hall.

Is a theme park good for team building?

Yes, because it mixes people without ranking them. Queues and walks between rides give colleagues long, easy conversations, and everyone chooses their own level. Plan for people who will not ride, and remember park entry and ride time are only available on days the park is open.

Give your team a day somewhere different

Tell us the date, the headcount and which outdoor activities you want, and the room, the park and the wet plan come back on one quote.