Choosing an exhibition venue comes down to three checks beyond capacity: the door your stands come in through, the floor they stand on, and power at every stand. At the Lakeside Hall the floor is 30 m by 25 m with an exhibition capacity of 420, and power and load-in are confirmed for your event in writing before you book. Those checks matter because every venue publishes a capacity and almost none publishes a door. So an exhibition gets booked on the number of people the room holds, and the real problem turns up six weeks later, when the stand contractor asks how wide the get-in is and nobody at the venue can answer without walking down there to look at it.
An exhibition is the one format where the building is a piece of equipment rather than a backdrop. Stands arrive on vehicles, get built by people charging by the hour, need power at a specific point on the floor, and have to come out again the same night. Here is what decides whether any of that is straightforward, and how it works at our exhibition venue, the Lakeside Hall.
Choosing an exhibition venue: the three numbers it turns on
Capacity, floor area and get-in. Everything else follows from them, and a venue that cannot give you all three in writing is a venue to press harder.
- Exhibition capacity: 420 — The figure for the exhibition layout specifically. The same floor is 500 theatre and 300 cabaret, which is why a single headline capacity tells you almost nothing about your show, and why it is worth checking which layout any competing venue quoted you.
- Floor area: 30 m by 25 m — 750 square metres in one open room, on a clear span with no columns anywhere in it. For an exhibition the proportion matters as much as the total: a central run of stands with a gangway either side and a perimeter run down the walls, with no pillar in the middle of anybody's stand.
- Get-in: confirmed for your event — The load-in route and its dimensions are set out in writing with your quote. Ask for them in your first email here and everywhere else, because that number decides whether your build arrives on a pallet truck or on somebody's shoulder.
Ask for the door before you ask for the capacity. Every hall in the country will tell you what it holds. The number that cancels an exhibition is the size of the get-in, and it is the number least often published.

Getting the stands in
Load-in is the half of an exhibition that costs money without ever appearing on a plan. A crew that cannot drive to the floor carries everything instead, and carrying is charged in hours at a contractor's day rate however good the room is once they get there. It is also the half nobody asks about until the room is booked.
So here is the brief, in roughly the order a stand contractor asks for it. Send the same six lines to every venue on your shortlist and compare the answers side by side.
| Question | The Lakeside Hall | What it decides |
|---|---|---|
| Load-in | Confirmed for your event | Whether a van drives in or a crew unloads at the kerb |
| Route to the floor | Confirmed for your event | Pallet trucks and wheeled cases, or a lift and a corner |
| Floor loading | Confirmed for your event | What can drive on, and where it can stop |
| Height | Confirmed for your event | Tall product, hanging signage, anything with a second level |
| Rigging | Confirmed for your event | Whether banners fly or stand on their own frames |
| Power | Confirmed for your event | How many stands can run more than a laptop |
Every one of those comes back in writing with your quote, measured for your show rather than read off a brochure. The useful thing about asking in this order is that the answers arrive in the order your contractor needs them.
Power to every stand, and where that stops being true
Power to every stand is the claim most easily made and least easily checked. The way to check it is to send numbers rather than to ask a yes-or-no question.
- The stand count — With the draw per stand. A laptop and a lamp is one thing; a screen, a coffee machine and a demo rig is another.
- What needs its own supply — Anything with a motor, a compressor or a heating element belongs on a supply of its own rather than in a four-way extension shared with the next stand.
- Who distributes it — The supply in a building and the distribution to eighty stands are different jobs. If your show is large, a power contractor belongs in your first budget draft rather than in week five.
- When it is worked out — In advance, from a floorplan, rather than on the build morning by whoever is holding the reel. Send the count and your planner confirms the power for your event in writing.
Floor loading, and the sentence to say out loud at enquiry
Moving a load across a floor and leaving one standing on it are different questions. A machine on a plinth, a pallet that stays where it lands, a vehicle parked for eight hours rather than driven through: the answer depends on the weight and the footprint together, not the weight alone.
So say both. Two tonnes means very little on its own; two tonnes on four small feet and two tonnes on a two-metre base are different problems with different answers. Floor loading here is confirmed for your event, and giving the footprint with the weight is what makes the answer exact.
The floor finish is worth a line for the ordinary reason. The Hall is carpeted, and wheeled flight cases and pallet trucks need more effort on carpet. Put it in the brief and the crew arrives with the right kit.

The room on show day
A build is a morning. The show is six or eight hours of people walking a floor, and the room has to hold up for that part as well.
- It is one open room, set to your show — So the floor can be sized to the show rather than the show stretched to the floor, and your planner draws the split for your stand count.
- Total blackout, and no daylight — The Hall has no windows. For an LED wall or a live demo that is the right answer, because nothing is fighting the sun at three o'clock. For a visitor on the floor from nine to five it is the argument for taking the breaks out to the Terrace, the Hall's own deck, when the weather allows.
- A kitchen on site — Along the stage end of the Hall, so exhibitor lunches and visitor coffee do not have to arrive in a van.
- Getting exhibitors and visitors here — We are straight off the M25 at junctions 11 to 13, and the rail route is set out on your quote, so exhibitors can plan the van and visitors the train. Ask how parking works for an exhibition on your date.
When this is the wrong building for your show
Three shows we would rather turn away at enquiry than disappoint in week five. If yours is none of them, ask about a date through our exhibition space hire page.
- More than 420 people on the floor at one time — 420 is the exhibition figure and it is the whole room. A show expecting a thousand visitors across a day is comfortable; a show expecting a thousand at eleven in the morning is not. Model the peak rather than the footfall, and do it before you draw the floorplan.
- A build that arrives on an articulated lorry — Settle early where the trailer stops and what moves the load from there, and put the extra crew hours in the quote rather than in the surprise. The load-in confirmed for your event is the number to plan it around.
- A small show hoping to use the Garden Marquee — The Marquee has no exhibition capacity, and its size is on request. It is a second room beside the Hall, not an exhibition hall, and we would rather say so now than take the booking.
Questions people ask
How much exhibition space do you have?
One open room on a 30 m by 25 m floor, 750 square metres on a clear span with no columns to design around. The exhibition capacity is 420 people at one time, and your planner sets the floor plan to the size of your show.
Can a vehicle get to the hall for load-in?
The load-in route and what it will take are confirmed for your event, in writing, with your quote. Tell us the largest vehicle and the heaviest item in your first email and the answer comes back for your show rather than in general.
Is there power at every exhibition stand?
Send a stand count with the draw per stand, and your planner confirms the power for your event in writing. For a large show, budget for a power contractor to distribute it to the stands, because that is a separate job from the supply.
Can we hang banners and signage above the stands?
Rigging is confirmed for your event. Tell us what you want to fly, its weight and where, and the answer comes back with your quote, before your contractor builds anything.
Do we get the day before for the build?
It is quoted rather than assumed, because whether the room is free the day before depends on what is booked around you. Access on the show day itself is agreed with your final details. Ask early.
Give your team a day somewhere different
Send the stand count, the show dates and the heaviest thing on your list, and your planner comes back within one working day with the room, the build and the power on one quote.